I reached out to AFPC/DP2OR about generic timelines for UPT selects specifically and was told their working to load MFS dates right now for those that need it, followed by IFT. Not sure if it's the same for everyone, but I was told late Spring-Summer for IFT and Fall PCS......... a bit later than I had hoped.